Table of Contents:
Boatplans.dk
Amro Chemicals
MyBlog:
2014
// - - - - - - - - - - - - - - - - - - - - - - - - - 2013 - - - - - - - - - - - - - - - - - - - - - - - - - - //
2014
August:
Sat 16: Glassed joints for water storage compartment.
Fri 15: Finish cockpit cover and added last part of cockpit sole.
Thu 14: Cut and polish new wood posts for the cover.
Tue 12: Glassing top part of cockpit cover.
Mon 11: Fileting of the joints of cockpit cover.
Sun 10: Preparing Cockpit Cover.
Sat 09: Cutting part of trunk.
Wed 06: Gluing the cabin arch.
Tue 05: Glassing of inside of front cupboard.
Mon 04: Preparing of front part cupboard.
Sun 03: Fiberglassing of cabin joints inside and out.
Sat 02: PUtting other glue points and removing cable-ties.
Fri 01: Putting glue points to cabin roof.
Sat 16: Glassed joints for water storage compartment.
Fri 15: Finish cockpit cover and added last part of cockpit sole.
Thu 14: Cut and polish new wood posts for the cover.
Tue 12: Glassing top part of cockpit cover.
Mon 11: Fileting of the joints of cockpit cover.
Sun 10: Preparing Cockpit Cover.
Sat 09: Cutting part of trunk.
Wed 06: Gluing the cabin arch.
Tue 05: Glassing of inside of front cupboard.
Mon 04: Preparing of front part cupboard.
Sun 03: Fiberglassing of cabin joints inside and out.
Sat 02: PUtting other glue points and removing cable-ties.
Fri 01: Putting glue points to cabin roof.
Fri 25: Prepared decking for sides of cabin.
Wed 23: Second gunwale glued.
Tue 22: First gunwale glued.
January:
Mon 13: Finished with metal structure.
Thu 09: Bought steel tubes.
Thu 02: Cyclone getting closer.
Mon 13: Finished with metal structure.
Thu 09: Bought steel tubes.
Thu 02: Cyclone getting closer.
// - - - - - - - - - - - - - - - - - - - - - - - - - 2013 - - - - - - - - - - - - - - - - - - - - - - - - - - //
December :
Tue 31 : Boat bundled
Mon 30 : Gone to buy paint
Sun 29 : Second sole fixed to cockpit
Sat 28 : first part of cockpit sole is fixed to the boat
Fri 27 : Cockpit sole now ready for installation
Thu 26 : lots of painting jobs done
Wed 25 : Christmas work
Tue 24 : Painting bilge and adding second layer of fiberglass onto transom
Mon 23 : looking for connectors for the bilge water-removal and adding first layer of fiberglass to the transom
Sun 22 : Preparing the wood to reinforce the seats and cutting the first pipes for the bilge water removal system
Sat 21: The fiberglass is now dry
Fri 20 : Adding fiberglass to the compartment separations underneath the cockpit sole
Thu 19 : gluing separations underneath cockpit sole
Wed 18 : Finishes pod looks nice
Tue 17 : Finishing work on the pod
Mon 16 : A boat growing
Sun 15 : Preparing the cockpit sole and its hatches
Tue 10 : Removing G-Clamps
Mon 09 : Gluing wooden parts underneath cockpit sole
Sun 08 : Reinforcing the pod and preparing port side bench hatches
Thu 05 : Trying the hatches and preparing the benches
Wed 04 : Preparing the stiffeners of the cockpit sole underside.
Tue 03 : Preparing the wooden parts to give extra strength to the boat.
Mon 02 : Planed the inwales and prepared the front reinforcements
November:
Tue 31 : Boat bundled
Mon 30 : Gone to buy paint
Sun 29 : Second sole fixed to cockpit
Sat 28 : first part of cockpit sole is fixed to the boat
Fri 27 : Cockpit sole now ready for installation
Thu 26 : lots of painting jobs done
Wed 25 : Christmas work
Tue 24 : Painting bilge and adding second layer of fiberglass onto transom
Mon 23 : looking for connectors for the bilge water-removal and adding first layer of fiberglass to the transom
Sun 22 : Preparing the wood to reinforce the seats and cutting the first pipes for the bilge water removal system
Sat 21: The fiberglass is now dry
Fri 20 : Adding fiberglass to the compartment separations underneath the cockpit sole
Thu 19 : gluing separations underneath cockpit sole
Wed 18 : Finishes pod looks nice
Tue 17 : Finishing work on the pod
Mon 16 : A boat growing
Sun 15 : Preparing the cockpit sole and its hatches
Tue 10 : Removing G-Clamps
Mon 09 : Gluing wooden parts underneath cockpit sole
Sun 08 : Reinforcing the pod and preparing port side bench hatches
Thu 05 : Trying the hatches and preparing the benches
Wed 04 : Preparing the stiffeners of the cockpit sole underside.
Tue 03 : Preparing the wooden parts to give extra strength to the boat.
Mon 02 : Planed the inwales and prepared the front reinforcements
November:
Wed 27: Glassing one before last compartment and double transom
Wed 20 : Mum learns Sanding
Mon 18: Glassing the motor pod
Wed 13 : Fiberglassing of the foremost compartment of the boat
Wed 20 : Mum learns Sanding
Mon 18: Glassing the motor pod
Wed 13 : Fiberglassing of the foremost compartment of the boat
October:
Sat 26 : Ensuring alignment for new pod
Fri 25: Pod panels being worked on
Thu 24 : The new pod
Wed 23: The making of a motor pod for the boat
Sat 26 : Ensuring alignment for new pod
Fri 25: Pod panels being worked on
Thu 24 : The new pod
Wed 23: The making of a motor pod for the boat
September:
Sat 21 : Fixing cabin entrance
Sun 01 : Cut our first gunwale
August:
Fri 16 : Adjusting the bulkheads
Thu 15 : Gluing the panels inside
Fri 9 : Cutting out the Bulkheads using Dremmel
Wed 07 : Building a ladder to get into the boat and sanding the inside
Sun 03 : Building a table-saw and photo shoot
Sat 02 : Turning boat upright
Fri 02 : First bath of Serenite and more sanding
Wed 31 : Adding second fabric layer
Tue 30 : Fixed Transom and glassed sides
Mon 29 : First layer of glass onto hull of boat
Sun 28 : Removed jig and bulkheads, lowered boat, sanded, and finished glassing bottom edges.
Sat 27 : Finished fiberglassing of panel edges
Fri 26 : Gluing two other edges
Thu 25 : Cutting of fiberglass strips, and some gluing......and lots of sanding
Wed 24 : Gluing of midsection of boat bottom
Tue 23 : Gluing of other side and filling holes
Mon 22 : Sanding, filling holes, gluing and more sanding
Sun 21 : A "sticky" day
Sun 14 : Completing the shape of the boat hull.
Sun 07 : Placing the sides of the boat onto the bulkheads.
Sat 06 : Placing bottom Panels.
Tue 02 : Fixing the bulkheads.
June :
Sun 29 : Building the Base for the Jig
Mon 17 : Start of gluing.
Sun 16 : Wood for Jig delivered home
Sat 15 : All wooden pieces ready for glueing
Fri 14 : Break Test
Mon 10 : Testing our Epoxy Glue
Sun 29 : Building the Base for the Jig
Mon 17 : Start of gluing.
Sun 16 : Wood for Jig delivered home
Sat 15 : All wooden pieces ready for glueing
Fri 14 : Break Test
Mon 10 : Testing our Epoxy Glue
May :
Sat 24 : Bought Small drill
Fri 24 : Buy Epoxy for test
Sun 12 : Sharpening Block planes
Sat 11 : Starting on actual wood for boat
Wed 08 : Dremel SawMax
Wed 01 : Testing Front Part Curvature
April :
Fri 26 : Got Batteries
Sat 20 : Putting up big marquee
Thu 11 : Bought plywood for boat
Wed 10 : Got our Marquee
Sun 07 : Remove little mini
Fri 05 : Bought Boat plans
Sat 24 : Bought Small drill
Fri 24 : Buy Epoxy for test
Sun 12 : Sharpening Block planes
Sat 11 : Starting on actual wood for boat
Wed 08 : Dremel SawMax
Wed 01 : Testing Front Part Curvature
April :
Fri 26 : Got Batteries
Sat 20 : Putting up big marquee
Thu 11 : Bought plywood for boat
Wed 10 : Got our Marquee
Sun 07 : Remove little mini
Fri 05 : Bought Boat plans
No comments:
Post a Comment